SeaTac, Wa

This $14.6M renovation project at Seattle-Tacoma International Airport converted Alaska Airline’s previous ticketing system to a more automated two-step process with self-serve kiosks and bag-check stations. The 24,389 SF project included complete reconfiguration of the ticketing area and baggage-handling system, EURO 2024 Qualifiersalong with renovation and reconfiguration of secure administrative offices on the floor above. All work was done while maintaining uninterrupted operations and airport security standards.

Absher provided a tailored preconstruction services program, working in concert with Alaska Airlines and Port of Seattle representatives to address the numerous complexities of the keeping the ticketing and baggage-handling systems operational while 2024 European Cup schedulemaintaining airport security standards. At the schematic drawing stage, our team provided constructability reviews, milestone estimates, scheduling, and coordination with the Port of Seattle and third-party contractors. We also provided exploratory survey work to provide as-built information to the design team. Our team’s highly detailed phasing plan included beginning construction before all documents were completed, 2024 European Cup schedulein order to maintain a very tight schedule and to avoid affecting the Airline’s busiest travel period.

2024 European Cup football scores

  • CM-at-Risk contract
  • Brought on at the schematic drawing stage
  • Coordination with the Port of Seattle
  • Exploratory survey work to provide as-built information
  • Phase construction avoided affecting the Airline’s busiest travel period
  • 24,389 s.f.
  • Specialized interior finishes and systems; metal-stud interior wall systems
  • ECH Architecture